Intelia, Ciena partner to boost connectivity in French Polynesia

French Polynesian telecom operator ONATi, a subsidiary of the OPT French Polynesia Group, has selected Intelia and Ciena to increase the capacity of the Honotua international submarine cable to 300Gb/s. The last stage of operations was successfully carried out in October 2022 thanks to the engagement and expertise of the ONATi, Intelia and Ciena teams.

The Honotua international cable was upgraded using Ciena’s GeoMesh Solution powered by the 6500 Packet-Optical Platform and WaveLogic Ai technology providing 300Gb/s of information-carrying capacity on a cable system supporting an upgrade path to 5Tb/s of total capacity to rapidly address future growth. The Honotua international cable is a 4,500km submarine communication system that interconnects several islands of French Polynesia from Tahiti to Hawaii. The Honotua international cable system was deployed in 2009, and it is owned and operated by the OPT French Polynesia Group to supply connectivity to more than 220,000 mobile subscribers, 45,000 fixed internet customers and 16,000 audio-visual multimedia users.

The local expertise of the integrator Intelia and operator teams combined with Ciena’s technology and unparalleled submarine network experience were critical to ensure the connectivity requirements for the Honotua international cable system.

“This turnkey project is an important milestone for boosting French Polynesia international connectivity and we are proud ONATi has collaborated with Intelia and Ciena to implement it,” says Romain Dhalluin, CEO, Intelia.

“Through the collaboration with ONATi and Intelia, we’ve increased the capacity of the Honotua international submarine cable to 300Gb/s, creating a super-fast digital highway that addresses the connectivity needs of French Polynesia,” says Matthew Vesperman, vice president, Asia Pacific, Ciena.

Comment on this article below or via Twitter: @VanillaPlus OR @jcvplus

RECENT ARTICLES

New DC BLOX fibre route enhances southeast connectivity

Posted on: May 17, 2024

DC BLOX has announced that its new dark fibre route connecting its Myrtle Beach Cable Landing Station (CLS) to Atlanta has been completed. This unique high-capacity East-West route serves as

Read more

EchoStar to provide 5G services for U.S. Navy’s spiral 4 programme

Posted on: May 16, 2024

EchoStar Corporation has announced they have been awarded an indefinite delivery, indefinite quantity (IDIQ) contract as part of the U.S. Naval Supply Systems Command Spiral 4 wireless products and services

Read more